AS9102 Form 3 Dimensional Results: How Do You Catch an Out-of-Tolerance Characteristic Before the FAI Ships?
Audits and Compliance
AS9102AS9102C

AS9102 Form 3 Dimensional Results: How Do You Catch an Out-of-Tolerance Characteristic Before the FAI Ships?

The FAI that gets rejected two weeks after you ship it usually fails on one out-of-tolerance result nobody flagged. Here is how QualityEngineer.ai records AS9102 Form 3 dimensional results against the ballooned drawing so every measured value is checked against its own tolerance the moment it is entered, not by the customer's source inspector.

August 2, 202611 min read
AS9102 Form 1 Part Number Accountability: The Cover Sheet That Locks the FAI Binder and How Rev C Rewrote It
Audits and Compliance
AS9102AS9102C

AS9102 Form 1 Part Number Accountability: The Cover Sheet That Locks the FAI Binder and How Rev C Rewrote It

Form 1 is the smallest sheet in an AS9102 FAI package and the one that determines whether the reviewer even opens Form 2. A field by field walkthrough of Form 1 under AS9102 Rev C: the Part Type shift that replaced the serial number, the signature lock that closes the binder, the sub-assembly rollup rules, the full versus partial declaration, the four kickback patterns that eat submissions, and a pre-submission QA pass a supplier quality lead can run in twenty minutes.

July 1, 202613 min read
FAI vs PPAP: When Aerospace Suppliers Need First Article Inspection, PPAP, or Both
PPAP and Submission
FAIPPAP

FAI vs PPAP: When Aerospace Suppliers Need First Article Inspection, PPAP, or Both

FAI under AS9102 and PPAP under AIAG cover similar ground for different supply chains. A practical guide to where they overlap, where they don't, which customers ask for which, and how dual-cert aerospace shops keep one source of truth feeding both submissions.

June 10, 202612 min read
Characteristic Accountability in AS9102: How to Balloon a Drawing So Form 3 Maps One to One
Audits and Compliance
AS9102AS9102C

Characteristic Accountability in AS9102: How to Balloon a Drawing So Form 3 Maps One to One

Characteristic accountability is where most AS9102 FAI packages get rejected. A practical guide to ballooning a drawing under Rev C, what counts as a characteristic, how GD&T and notes get numbered, and how to make Form 3 map one to one to the design record.

June 3, 202611 min read
AS9102 First Article Inspection: How Form 1, Form 2, and Form 3 Fit Together Under Rev C
Audits and Compliance
AS9102AS9102C

AS9102 First Article Inspection: How Form 1, Form 2, and Form 3 Fit Together Under Rev C

A practical guide to the AS9102 First Article Inspection report under Rev C. Form 1 part accountability, Form 2 material and process verification, Form 3 dimensional results, when an FAI is required, how to handle re-accomplishment, and what changed from Rev B.

May 17, 202612 min read