Topic

PPAP and Submission

PPAP is the contract that proves a supplier can build a production part to spec, every time. It bundles the design record, process flow, PFMEA, control plan, MSA, capability study, dimensional results, and customer specific paperwork into one submission that an OEM signs off before approving production. Quality engineers live in PPAP, but most teams still run it on a spreadsheet, a shared drive, and a prayer. The guides in this topic walk through the 18 elements, the submission levels, the gotchas that hold up signoff, and what changes when a platform owns the document trail instead of a human.

9 articles in this topic

Featured article

What is PPAP? A Complete Guide for Quality Engineers
PPAP and Submission
Featured

What is PPAP? A Complete Guide for Quality Engineers

Everything quality engineers need to know about PPAP, definition, the 18 elements, submission levels, common mistakes, and how AI is changing the process.

Read the full guide

PPAP Fundamentals

What PPAP is, what it requires, and how the elements fit together.

Part Submission Warrant: How Do You Fill Out a PSW That Matches What Is Actually in the Package?
PPAP and Submission
PPAPPart Submission Warrant

Part Submission Warrant: How Do You Fill Out a PSW That Matches What Is Actually in the Package?

Most PPAP rejections on the warrant are not manufacturing problems. A box is checked for an element that is not in the folder, or the revision on the cover does not match the design record behind it. Here is how QualityEngineer.ai generates the Part Submission Warrant from the package itself, so PPAP Element 18 cannot claim something the submission does not contain.

August 5, 202610 min read
PPAP Submission Levels 1 Through 5: What Each Level Requires and How Your Customer Decides Which One You Submit
PPAP and Submission
PPAPPPAP Levels

PPAP Submission Levels 1 Through 5: What Each Level Requires and How Your Customer Decides Which One You Submit

A practitioner walkthrough of the five PPAP submission levels in the AIAG PPAP 4th Edition. What Level 1 through Level 5 each require you to submit versus retain, why Level 3 is the default, how the customer designates the level, what a significant production run has to look like, and how to read the Submission and Retention Requirements table so your package matches what the SQE actually asked for.

July 19, 202612 min read
AS9145 Aerospace APQP and PPAP: A Field Map for Suppliers Coming From AIAG
PPAP and Submission
AS9145APQP

AS9145 Aerospace APQP and PPAP: A Field Map for Suppliers Coming From AIAG

An aerospace customer just flowed down AS9145 instead of AIAG APQP and PPAP. Here is a practical mapping of the five phases, the 11 aerospace PPAP elements versus the automotive 18, where AS9145 diverges from what you already do, and the traps that get a first submission kicked back.

July 15, 202612 min read
PPAP Element 11 Initial Process Studies: What Ppk Value Passes and Why Reviewers Reject the Number Before They Read It
PPAP and Submission
PPAPElement 11

PPAP Element 11 Initial Process Studies: What Ppk Value Passes and Why Reviewers Reject the Number Before They Read It

Element 11 is where the statistical work of a PPAP package either holds up or collapses. A reviewer's-seat walkthrough of Initial Process Studies under AIAG PPAP 4th Edition: why initial studies report Ppk and not Cpk, the three-tier acceptance criteria at 1.33 and 1.67, the two prerequisites a reviewer verifies before trusting your index, the significant production run sample rules, the non-normal and one-sided characteristic trap that voids a clean-looking number, five kickback patterns, and a pre-submission QA pass you can run in fifteen minutes.

July 5, 202613 min read
PPAP 18 Elements Checklist: What Each Element Has to Show to Pass a Customer Submission Review
PPAP and Submission
PPAPPPAP Checklist

PPAP 18 Elements Checklist: What Each Element Has to Show to Pass a Customer Submission Review

A practitioner checklist for all 18 PPAP elements under the AIAG PPAP 4th Edition. What each element actually has to contain, the reviewer mindset on the customer side, and the specific defects that get a Level 3 package kicked back to Interim.

June 14, 202613 min read
FAI vs PPAP: When Aerospace Suppliers Need First Article Inspection, PPAP, or Both
PPAP and Submission
FAIPPAP

FAI vs PPAP: When Aerospace Suppliers Need First Article Inspection, PPAP, or Both

FAI under AS9102 and PPAP under AIAG cover similar ground for different supply chains. A practical guide to where they overlap, where they don't, which customers ask for which, and how dual-cert aerospace shops keep one source of truth feeding both submissions.

June 10, 202612 min read

PPAP Software

Tooling decisions, platform comparisons, and what to look for when you replace spreadsheets.

Related topics

Stop managing PPAP in spreadsheets

QualityEngineer.ai automates the documentation-heavy parts of quality engineering: PPAP, supplier assessments, document analysis, and more.

Try it free, no credit card required